01 / BEFORE ERECTIONPre-erection inspection
Review accessible components, records and required testing before the crane is assembled.
- Component identification, available crane records and previous reports.
- Visual inspection, required structural NDT and supporting technical reports.
- Findings and required corrective-work verification before erection.
O. Reg. 213/91, s. 158 ↗ · PEO Part A

