Good Engineering Practice in Suspended...
Posted By Ralph Balbaa M.Eng., P.Eng. On February 1, 2017
In designing and constructing suspended elevating platforms and supporting structures, good engineering practice and the following Regulations and Standards and Codes must adhered to:
The designer must consider the capacity of the powered hoists as well as the rated load and dead load of the... Read More